Finishing up the initial packout. We filled in the scallops/valleys
between each pair of tires a few weeks ago. Now we've connected them
with more concrete mix. I like to think of the filled scallops as O's
that we just connected by a bunch of X's. We still have just shy of 50
tires to pound along the front (south facing wall to support the
windows). Once the tires are done we'll be continuing packout with
adobe, making the walls one relatively smooth surface with no lumps.
|
Bonus pic: Maghda had puppies!!! |
No comments:
Post a Comment